FLOOR INSTALLATION
KNOW-HOWAug 2, 2015
- Clean the floor bed completely before starting work.
- The perfect mortar ratio of cement :sand is 1:3
- Cement: low Alkali contained ,Portland type I.
- Sand: clear river sand
- Water: uncontaminated water.
- The cement mortar must be evenly mixed, poorly mixed mortar results poor structural and effect bonding strength. The hollowing or cracking maybe caused due to the improper mixing of mortar.
- Use Neutral (non-acidic or alkaline) grouting to seal the joint.
- To seal the joint in 48 to 72 hours after tiling process, the safe joint (gap) is 0.5-2.0mm.
- Please give enough drying time for the substrate properly.
- The tiles are required well protection covered by plastic form tarps and paper boards after being finished joint.
Please consult your stone specialist for more details.